Solution: Plant Safety: QRA

Solution: Plant Safety: QRA

Dipl.-Ing. Dr. Martin Doktor

Deutschstraße 10 1230 Wien Österreich

+43 5 0454 6137

Send email

TÜV AUSTRIA Vertrieb

Deutschstraße 10 1230 Wien

+43 5 0454 1700

Send email

TÜV AUSTRIA GMBH

Region: Österreich

Deutschstraße 10 1230 Wien Österreich

+43 5 0454 0

Send email

QRA - Quantative Risk Assessment

In which region do you need this solution?

"The objective of the QRA (Quantitative Risk Assessment) is to assess individual and societal risks associated with major accident hazards."

The objective of the QRA (Quantitative Risk Assessment) is to assess individual and societal risks associated with major accident hazards.

Essentially, effects caused by incidents on occupied buildings (such as control rooms or administration buildings) within a plant area as well as effects which extend beyond the boundaries of the plant (neighboring plots of land or roads) are examined and assessed, taking the relevant population into account.

The scenarios used to prepare a QRA are those that are part of the Fire and Explosion Analysis (FEA) and may also include cases prescribed by the relevant methodology (Purple Book).

Impact analyses done with propagation calculations are used for external emergency planning and can be called on for spatial planning and surface area use planning.

"*" indicates required fields

Land*
Address
This field is for validation purposes and should be left unchanged.

I am tami

Are you here for the first time? I will be happy to help you find your way around.

Check certificate

Find a solution

Submit science award

Check certificate

  • Person Certificate

  • Product Certificate

  • System Certificate

  • Verification of Conformity

Enter the data and check a certificate

Find a solution

WiPreis einreichen

WiPreis submit

"*" indicates required fields

1
2
3
4
First, please select in which category you would like to submit*

You cannot copy content of this page